Free contractor proposal template

A complete proposal you can print, save as a PDF or copy into Word, with the schedule, options and payment plan that turn a price into a signed job.

By Joe Soltis, contractor and founder of QuickBidAI ·

In short

A contractor proposal has eight parts after your business and customer details: a project overview, the scope of work, a schedule, the price, optional upgrades, a payment schedule, what's not included, and warranty and terms, followed by signature lines. The template below has all of them and is free to print or copy. The difference from an estimate is the schedule, options and payment plan. Those are what help a customer say yes.

The template

Fill in the blanks, or print it and write on it in the truck. The job and numbers shown are an example. Replace them with your own.

[Your Business Name]

[Street address, city, state ZIP]

[Phone] · [Email]

License #: ____________ · Insured by: ________

Proposal

Proposal #: ____________

Date: ____________

Valid until: ____________

Prepared for

Name: ____________________

Phone: ___________________

Email: ___________________

Job location

Address: _________________

City / State / ZIP: ________

1. Project overview — Basement finish — 20' x 30' (600 sq ft)

Finish the open basement into a family room with a utility closet: framed and insulated walls, new lighting and outlets, drywall, paint, vinyl plank flooring and trim. Work follows the walkthrough on [date] and the layout sketch attached.

2. Scope of work

  • •Frame exterior walls with treated bottom plate; frame utility closet with door opening
  • •Install foam board and batt insulation on exterior walls
  • •Electrical by licensed electrician: 8 outlets, 2 switched lighting circuits, 1 GFCI
  • •Hang, tape and finish drywall on walls and ceiling; leave access panel at shutoffs
  • •Prime and paint walls, ceiling and trim (owner selects 2 colors)
  • •Install luxury vinyl plank flooring over underlayment
  • •Install 2 interior doors, base trim and casing; final clean

3. Schedule

Start date: ____________ · Estimated length: 4–5 weeks

  • •Week 1: framing and electrical rough-in, then inspection
  • •Weeks 2–3: insulation, drywall hang and finish
  • •Week 4: paint, flooring, doors and trim
  • •Final walkthrough and punch list within 5 days of completion

4. Your price

Labor — framing, insulation, drywall, paint, flooring, trim
$12,500.00
Electrical — licensed electrician
$2,800.00
Materials (lumber, insulation, drywall, paint, flooring incl. 10% waste, trim, doors)
$7,441.40
Permit (billed at cost, estimated) and dumpster
$835.00
Subtotal
$23,576.40
Sales tax on materials
$446.48
Total
$24,022.88

5. Optional upgrades — initial to add

☐ Add 6 recessed LED lights on a dimmer · Initials: ____
+ $720.00
☐ Sliding barn door on utility closet instead of swing door · Initials: ____
+ $540.00

6. Payment schedule

Deposit at signing (10%)
$2,402.29
When drywall starts (40%)
$9,609.15
When flooring and trim start (40%)
$9,609.15
At final walkthrough (10%)
$2,402.29

7. Not included

  • •Moisture, mold or foundation repair found behind existing finishes
  • •Plumbing, HVAC duct changes or a bathroom
  • •Egress window or code upgrades the inspector requires beyond this scope
  • •Moving stored items out of the basement

8. Warranty and terms

  • •Proposal valid for 30 days from the date above
  • •Changes to scope are priced by written change order before work proceeds
  • •One-year warranty on workmanship; manufacturer warranty on materials
  • •Work hours Mon–Fri, 8 am – 5 pm

Acceptance

By signing, the customer accepts this proposal, its price and terms.

Customer signature / date

Contractor signature / date

Or skip the typing

With QuickBidAI you talk through the job into your phone while you're still standing in it. A filled-in proposal with scope, materials, price, exclusions and terms comes back in about a minute. You check every price before it goes out.

What's the difference between a proposal and an estimate?

An estimate answers “how much?”

Scope, labor, materials and a total. It's what you hand over when a customer is comparing prices.

A proposal answers “why you, and what happens next?”

It adds a short project overview, a schedule, optional upgrades, a payment schedule, a warranty and a place to sign. It's what you send when you want the job.

Just need the numbers? Use the free contractor estimate template instead.

How do you write a contractor proposal that wins the job?

1

Open with the customer's project, not your company

Two or three sentences in their words: what they asked for and what they'll end up with. It shows you listened on the walkthrough.

2

Write the scope as a list they can check off

One line per piece of work. When the job's done, the customer should be able to walk the room and tick every line.

3

Give a realistic schedule

Start date, how many weeks, and what happens each week. Leave room for inspections and material delays. Late is worse than long.

4

Show one total, then the options

Give one clear price for the job as written, then list upgrades with their own prices. Customers who can say yes to extras usually don't haggle the base price.

5

Tie payments to progress

Deposit at signing, then payments when real work starts, with the last payment at the final walkthrough. Check your state's deposit rules. California, for example, caps home-improvement deposits at 10% or $1,000, whichever is less.

6

Spell out exclusions, warranty and how changes work

What's not included, how long your workmanship is covered, and that changes need a written change order. This is the part that prevents arguments.

7

Ask for the signature

Put an expiry date on it, usually 30 days, and follow up before it runs out. A signed proposal is your agreement on most small jobs.

What loses a job that should have been yours?

Sending a price with no schedule

The first question after “how much” is “when.” If the proposal doesn't answer it, the contractor who does gets the call back.

One giant lump sum

A single number with no breakdown looks padded. Break it into a few lines so the customer can see where the money goes.

No expiry date

Lumber and drywall prices move. Without a “valid until” date you can be held to a number from last season.

Waiting a week to send it

The proposal that lands first, while the customer still remembers your walkthrough, has the edge. Same-day beats perfect.